Skip to article
ecomservices.io
Traffic · How to run this
TargetsCalculatorContributionNot on this page yetPlatformsCalculatorTrackersCalculatorAudiencesNot on this page yetLandingsCalculatorAttributionCalculatorAffiliatesCalculatorPacingNot on this page yetOptimisationCalculatorImplementationNot on this page yet

Library · Traffic · How to run this

Quality rejects still burned the spend

How to run thisTraffic3 steps
CalculatorLead quality cut · Calculator lives in the articleOpen

Quality rejects still burned a share of spend. Waste $ = spend × (rejected ÷ total). Type rejected, total leads, and spend $.

Pair: Lead quality cut on Traffic. Dupes: duplicate lead waste. Caps: lead-cap exhaustion.

What you type

Rejected leads — leads cut for quality / invalid / buyer reject in the window.

Total leads — all leads in that same cohort.

Spend $ — media / affiliate spend allocated to that cohort.

Waste $ = spend × reject share. CutPct = rejected ÷ total × 100. Fix sources when waste $ is fat — do not invent a waste chip.

What not to do

Do not invent waste $. Do not mix cap leftovers into quality rejects. Do not treat pending as rejected without a rule. Do not blend all offers into one spend row when one owns the cut.

Related: Traffic, duplicate lead waste, lead-cap exhaustion, conversion reject rate.

Procedure

  1. Type rejected leads, total leads, and spend $.
  2. Read waste $.
  3. Fix sources when waste $ is material.

Failure modes

  • Inventing waste $.
  • Mixing cap leftovers into quality rejects.
  • Treating pending as rejected without a rule.

Worked example

None on this page yet. When one lands it will be a real case: what broke, the number, and what changed. Not a composite.

Glossary

Lead quality waste $
Cohort spend × (quality-rejected leads ÷ total leads).

Work with us — We run this job on your accounts. Services

FAQ

Is this duplicate lead waste?
Sibling lead waste. [Duplicate lead waste](/manuals/cake-duplicate-lead-rate) is dupes × CPA. This page is quality rejects × spend share → waste $.
Is this lead-cap exhaustion?
Related cap. [Lead-cap exhaustion](/manuals/cake-lead-cap-exhaustion) is unmet demand $ when the cap fills. This page is reject share of typed spend.
What waste $ should I invent?
None. Type rejected leads, total leads, and spend $ for the same cohort window.