Skip to article
ecomservices.io
Stock / inventory · How to run this
CoverCalculatorVelocityNot on this page yetPO cashCalculatorCOGSCalculatorStockoutCalculatorAmazon FBACalculator3PLCalculator

Library · Stock / inventory · How to run this

Fullstack QA hold clock to sellable release

How to run thisStock / inventory3 steps
CalculatorFullstack hold-to-release lag · Calculator lives in the articleOpen

Pull one Fullstack QA-hold cut. Take release day. Subtract hold day. That gap is FS hold-release lag days. Keep units on the cut so volume stays honest.

Pair: Hold-to-release lag on Stock. ASN twin: receipt-to-available. Bin twin: dock-to-putaway.

QA-hold math

Hold day — Day Fullstack parked the units on QA hold.

Release day — Day those units flipped sellable / ads-available off hold.

Units — Fullstack units on that hold-to-release cut.

FS hold-release lag days = release day − hold day. Climbing FS hold-release lag days means staff QA on that hold before you buy more inbound — leave blank chips alone.

Guardrails

Do not invent FS hold-release lag days. Do not dump receipt-to-available or dock-to-putaway exports into hold/release boxes. Do not treat lot-hold demand-$ days as hold-to-release calendar days. Do not blend holds when one Fullstack building owns the QA pile.

Related: Stock, receipt-to-available, dock-to-putaway, receiving not sellable.

Procedure

  1. Type hold day, release day, and units.
  2. Read FS hold-release lag days.
  3. Staff QA when FS hold-release lag days are material.

Failure modes

  • Inventing FS hold-release lag days.
  • Dumping receipt-to-available exports into hold/release boxes.
  • Treating lot-hold demand-$ days as hold-to-release calendar days.

Worked example

None on this page yet. When one lands it will be a real case: what broke, the number, and what changed. Not a composite.

Glossary

FS hold-release lag days
Release stamp − hold stamp on one Fullstack QA-hold cut.

Work with us — We run this job on your accounts. Services

FAQ

Is this Fullstack receipt-to-available lag?
QA hold/release vs ASN receipt/pickable. [Receipt-to-available lag](/manuals/fullstack-receipt-to-available-lag) stays on ASN-to-pickable. Hold / release days never leave the QA-hold cut here.
Is this Fullstack dock-to-putaway lag?
Hold release vs bin putaway. [Dock-to-putaway lag](/manuals/fullstack-dock-to-putaway-lag) aligns putaway against dock. Here you align sellable release against QA hold.
What FS hold-release lag days should I invent?
None. Source hold day, release day, and units from the same Fullstack QA-hold cut.