Library · Stock / inventory · How to run this
ShipBob receipt clock is not dock-to-putaway
Open one ShipBob FC cut. Read the available stamp. Subtract the receipt stamp. That day gap is SB receipt-available lag days. Keep units beside the gap so the cut width stays honest.
Tool: Receipt-to-available lag under Stock. Neighbor on Fullstack: Fullstack receipt-available. Putaway counterpart: dock-to-putaway.
FC columns
Receipt stamp — Calendar day ShipBob wrote when the ASN hit FC receiving.
Available stamp — Calendar day those units flipped to pickable / ads-available.
Units — ShipBob units on that receipt-to-available cut.
SB receipt-available lag days = available stamp − receipt stamp. When SB receipt-available lag days climb, staff receiving/QA on that FC before you buy more inbound — blank chips stay blank.
Stops
Never invent SB receipt-available lag days. Never dump dock-to-putaway day CSVs into receipt/available columns. Never treat pick-to-ship hours as receipt-to-available days. Never fuse FCs when one ShipBob building owns the inbound pile.
Related: Stock, Fullstack receipt-available, dock-to-putaway, receiving not sellable.
Procedure
- Type receipt day, available day, and units.
- Read SB receipt-available lag days.
- Staff receiving/QA when SB receipt-available lag days are material.
Failure modes
- Inventing SB receipt-available lag days.
- Dumping dock-to-putaway day exports into receipt/available boxes.
- Treating pick-to-ship hours as receipt-to-available days.
Worked example
None on this page yet. When one lands it will be a real case: what broke, the number, and what changed. Not a composite.
Glossary
- SB receipt-available lag days
- Available stamp − receipt stamp on one ShipBob FC cut.
Work with us — We run this job on your accounts. Services
FAQ
- Is this Fullstack receipt-to-available lag?
- ShipBob FC cut vs Fullstack campus. [Receipt-to-available lag](/manuals/fullstack-receipt-to-available-lag) stays on Fullstack. Receipt / available totals never leave ShipBob here.
- Is this ShipBob dock-to-putaway lag?
- Available/sellable stamp vs putaway/bin stamp. [Dock-to-putaway lag](/manuals/shipbob-dock-to-putaway-lag) aligns putaway day against dock day. Here you align available day against receipt day.
- What SB receipt-available lag days should I invent?
- None. Read receipt stamp, available stamp, and units from the same ShipBob FC cut.