ASN is not sellable received

How to run thisStock / inventory3 steps
CalculatorInbound ASN variance · Calculator lives in the articleOpen

An ASN is a promise. Received and damaged decide sellable. Sellable = received − damaged. Variance % = (ASN − sellable) ÷ ASN. Type ASN, received, and damaged.

Pair: Inbound ASN variance on Stock. Cover clock: receiving is not sellable. Kits: kit component shortfall.

What you type

ASN units — units on the advance ship notice / PO inbound for this receipt.

Received — units the 3PL counted in (gross, before damaged pull-out).

Damaged — of received, units marked damaged / unsellable on that receipt.

Sellable = received − damaged. Shortfall = ASN − sellable. Variance % = shortfall ÷ ASN. Chase the vendor or 3PL when variance is material — do not invent a shortage chip.

What not to do

Do not invent a variance percent. Do not treat ASN as on-hand cover. Do not mix transfer units into ASN. Do not ignore damaged when received looks “full.”

Related: Stock, receiving is not sellable, kit component shortfall, days of cover.

Procedure

  1. Type ASN units and received units.
  2. Type damaged / unsellable on that receipt.
  3. Chase the vendor or 3PL when variance is high.

Failure modes

  • Inventing a variance percent.
  • Treating ASN as on-hand cover.
  • Ignoring damaged when received looks full.

Worked example

None on this page yet. When one lands it will be a real case: what broke, the number, and what changed. Not a composite.

Glossary

ASN variance
(ASN − sellable) ÷ ASN. Sellable = received − damaged on the receipt.

Work with us — We run this job on your accounts. Services

FAQ

Is this receiving not sellable cover?
Related inbound. [Receiving is not sellable](/manuals/receiving-not-sellable) is the cover clock before dock-in. This page is ASN vs sellable units after receive.
Is this kit component shortfall?
Related short. [Kit component shortfall](/manuals/kit-component-shortfall) is BOM vs parent. This page is ASN vs dock sellable.
What variance should I invent?
None. Type ASN, received, and damaged from the 3PL receive report.