Skip to article
ecomservices.io
Stock / inventory · How to run this
CoverCalculatorVelocityNot on this page yetPO cashCalculatorCOGSCalculatorStockoutCalculatorAmazon FBACalculator3PLCalculator

Library · Stock / inventory · How to run this

Fullstack cross-dock trailer wait is not replen fill

How to run thisStock / inventory3 steps
CalculatorFullstack cross-dock lag · Calculator lives in the articleOpen

On one Fullstack cross-dock board, subtract the inbound trailer stamp from the outbound trailer stamp. Keep lines beside that span so volume stays honest. The span is FS cross-dock lag days.

Pair: Cross-dock lag under Stock. Sibling on replen: FS replen. Sibling on putaway: FS inbound-putaway.

Cross-dock-board stamps

In day — Calendar day Fullstack stamped when the inbound trailer hit the cross-dock scan.

Out day — Calendar day that freight left on an outbound trailer from the same board.

Lines — Fullstack cross-dock lines on that in → out slice.

FS cross-dock lag days = out day − in day. When FS cross-dock lag days stretch, clear the Fullstack cross-dock queue before you pace ads — blank chips stay blank.

Hard stops

Never invent FS cross-dock lag days. Never load replen or wave-release stamps into in/out boxes. Never treat inbound-putaway or receipt-to-available days as cross-dock out. Never blend FCs when one Fullstack building owns the cross-dock board.

See also: Stock, FS replen, FS inbound-putaway, FS wave-release.

Procedure

  1. Type in day, out day, and lines.
  2. Read FS cross-dock lag days.
  3. Clear the Fullstack cross-dock queue when FS cross-dock lag days stretch.

Failure modes

  • Inventing FS cross-dock lag days.
  • Dumping replen or wave-release into in/out boxes.
  • Folding inbound-putaway days into cross-dock out.

Worked example

None on this page yet. When one lands it will be a real case: what broke, the number, and what changed. Not a composite.

Glossary

FS cross-dock lag days
Out day − in day on one Fullstack cross-dock board.

Work with us — We run this job on your accounts. Services

FAQ

Is this Fullstack replen lag?
Cross-dock trailer in → out vs replen request → fill. [Replen lag](/manuals/fullstack-replen-lag) starts at replen request. Here the clock starts when freight hits the cross-dock inbound scan.
Is this Fullstack inbound-putaway lag?
Cross-dock pass-through vs bin putaway. [Inbound-putaway lag](/manuals/fullstack-inbound-putaway-lag) aligns putaway against dock. Here you align outbound trailer day against inbound trailer day without a bin stop.
What FS cross-dock lag days should I invent?
None. Read in day, out day, and lines from one Fullstack cross-dock board.