Skip to article
ecomservices.io
Payments · How to run this
LedgerReconNot on this page yetFeesCalculatorSettlementCalculatorReservesCalculatorStatementsEntitiesNot on this page yetCommerce reconNot on this page yet

Library · Payments · How to run this

Post-cutoff is not same-day settle

How to run thisPayments3 steps
CalculatorBatch cutoff miss · Calculator lives in the articleOpen

Post-cutoff txns ÷ batch txns make miss %. Next-day $ = post-cutoff × $ per txn. Type all three.

Pair: Batch cutoff miss on Payments. Fails: same-day ACH fail. Prenote: ACH prenote lag.

What you type

Post-cutoff — transactions submitted after the same-day batch cutoff.

Batch txns — total transactions in that batch window.

$ / txn — average dollars on the post-cutoff set (typed).

Miss % = post-cutoff ÷ batch × 100. Next-day $ = post-cutoff × $ / txn. Move submission earlier when miss % is fat — do not invent a miss chip.

What not to do

Do not invent miss %. Do not mix ACH returns into cutoff misses. Do not treat prenote holds as post-cutoff. Do not average every MID when one owns the hole.

Related: Payments, same-day ACH fail, ACH prenote lag, settlement batch lag.

Procedure

  1. Type post-cutoff txns, batch txns, and $ per txn.
  2. Read miss % and next-day $.
  3. Move submission earlier when miss % is material.

Failure modes

  • Inventing miss %.
  • Mixing ACH returns into cutoff misses.
  • Treating prenote holds as post-cutoff.

Worked example

None on this page yet. When one lands it will be a real case: what broke, the number, and what changed. Not a composite.

Glossary

Batch cutoff miss %
Post-cutoff transactions ÷ batch transactions × 100; next-day $ = post-cutoff × $ per txn.

Work with us — We run this job on your accounts. Services

FAQ

Is this same-day ACH fail?
Sibling ACH door. [Same-day ACH fail](/manuals/seamless-same-day-ach-fail) is fails ÷ attempts. This page is post-cutoff txns ÷ batch that miss same-day settle.
Is this ACH prenote lag?
Related clock. [ACH prenote lag](/manuals/seamless-ach-prenote-lag) is prenote days before first rebill. This page is cutoff miss % and next-day $.
What miss % should I invent?
None. Type post-cutoff txns, batch txns, and $ per txn from the same SeamlessChex / ACH batch.