Skip to article
ecomservices.io
Stock / inventory · How to run this
CoverCalculatorVelocityNot on this page yetPO cashCalculatorCOGSCalculatorStockoutCalculatorAmazon FBACalculator3PLCalculator

Library · Stock / inventory · How to run this

ShipBob FC wave cut to wave clear is not Fullstack wave board

How to run thisStock / inventory3 steps
CalculatorShipBob wave-release lag · Calculator lives in the articleOpen

Open a ShipBob FC wave export. Find the day the wave cleared outbound. Subtract the day the wave was cut. Pin orders beside that span so volume stays honest. The span is SB wave-release lag days.

Pair: Wave-release lag on Stock. Fullstack twin: FS wave-release. Pack twin: SB pack-to-ship.

FC wave stamps

Wave day — Calendar day ShipBob cut / released the pick wave on the FC export.

Clear day — Calendar day that wave cleared outbound on the same export.

Orders — ShipBob orders on that wave-cut → clear slice.

SB wave-release lag days = clear day − wave day. Stretching SB wave-release lag days means the ShipBob wave queue is backing up — clear that queue before you pace ads. Blank chips stay blank.

What not to do

Skip inventing SB wave-release lag days. Skip loading Fullstack wave-board CSVs into ShipBob boxes. Skip treating pack-to-ship or staging-dwell stamps as wave/clear. Skip blending FCs when one ShipBob building owns the wave export.

Related: Stock, FS wave-release, SB pack-to-ship, staging-dwell.

Procedure

  1. Type wave day, clear day, and orders.
  2. Read SB wave-release lag days.
  3. Clear the FC wave queue when SB wave-release lag days are material.

Failure modes

  • Inventing SB wave-release lag days.
  • Dumping Fullstack wave-board or pack-to-ship into wave/clear boxes.
  • Folding staging-dwell into wave-release.

Worked example

None on this page yet. When one lands it will be a real case: what broke, the number, and what changed. Not a composite.

Glossary

SB wave-release lag days
Clear day − wave day on one ShipBob FC wave export.

Work with us — We run this job on your accounts. Services

FAQ

Is this Fullstack wave-release lag?
ShipBob FC wave export vs Fullstack wave board. [Wave-release lag](/manuals/fullstack-wave-release-lag) stays on Fullstack. Wave / clear stamps belong on this ShipBob export.
Is this ShipBob pack-to-ship lag?
Wave cut → wave clear vs pack-complete → carrier ship. [Pack-to-ship lag](/manuals/shipbob-pack-to-ship-lag) starts at pack-complete. Here the clock starts when the wave is cut.
What SB wave-release lag days should I invent?
None. Read wave day, clear day, and orders from one ShipBob FC wave export.